A 27,081 square meters area is designed as a renewable Energy Production Unit, where a 100 MTPD dung-based plant will be in existence for generating Compressed Biomethane Gas (CBG).
Main Design Segments include the Dung Unloading Tank, Mixer Tank, ZPHB Reactor, Slurry Tank, Liquid Fertilizer Tank, and other Allied Administrative Service Buildings.