An 8,100 square meters area was designed as a Renewable Energy Production Unit, where 2000 cubic meters per day of Biogas is being generated from 40 tonnes per day (TPD) mixed waste.
Main Design Segments include the Dung Unloading Tank, Mixer Tank, ZPHB Reactor, Slurry Tank, Liquid Fertilizer Tank, and other Allied Administrative Service Buildings.